Construction
Sara designed and managed the construction of a house in Los Angeles about 20 years ago, and in late 2019 the family decided to sell it. She was delegated the task of getting it ready to put on the market, but there was a lot to do and a limited amount of time and money to do it.
With her experience designing the house and managing the original construction, and my experience managing projects and relationships with contractors, we were able to get a lot done in a short period.
After evaluating the situation, there was a long list of things that needed to be done:
- There were rats in the attic, which is very common problem in the area, as it backs up to a nature preserve.
- The garage floor was improperly poured, and needed to be ripped out and redone.
- The landscaping needed a lot of attention.
- There were seveal leaks in the sprinkler system, which caused the water bill to be excessively high.
- The exterior needed to be pressure washed and all wood and concrete trim needed to be painted.
- The gate entry system needed entry/exit keypads installed, for realtor and contractor access.
- The water fountain needed to be re-tiled and completed.
Thankfully, only some of the items required professional assistance. And, thankfully Sara's nephew James was available to help, because I would not have been able to do it without his help. For the next 5 months, I worked nearly everyday, making countless trips to Home Depot and doing more physical labor than I ever had before...
They also trimmed trees, cut back some very large palms at the road, and generally made everything look great. Gabriel was the owners name, and he was like an Angel, bringing everything he touched to life, it was impressive to see.
Whenever possible we used construction material left over from the original build, like the landscaping cloth and rock we trucked down the hill to the street planters.
I was able to use our air compressor and a spray gun, to apply all of the primer and paint. Quotes for painting were in the $25k range, so we opted to let the new owner paint the inside the way they liked, and to paint the exterior ourselves.
A lot of trips were made to the local Dunn-Edwards paint store, as we used a whole lot of paint.
The fountain was one of Sara's top priorities, as it had never actually worked. In the end, the pump turned on in the morning and off at night, providing the peaceful sound of running water that was able to be heard anywhere in front of the house.
It was a very long process, and after looking at all of the pictures again, it's amazing we actually got it all done. However, it was worth it in the end, and a lot was learned by all.
The next time something like that is done, I will just be supervising, but at least now I know, first hand, what it feels like after a day of digging trenches, and what having your hands in wet concrete all day does to your skin. Much respect to the manual laborers of the world, and many thanks to everyone who helped along the way...